Detailed anti-static terrazzo floor installation steps

date:2012/3/17 hit:1269
Anti-static terrazzo
1, anti-static terrazzo with sand, stone, cement, moldings and other materials shall comply with the relevant provisions.
Leveling layer 2, the conductive network construction, the use of dry cement mortar 1:3 (ratio by weight of cement) mixed with the composite conductive powder and conductive composite powder by a mortar with 0.2% conductive powder, and stir and stir well, cover the conductive network, and then the mosaic sub-grid.
3, metal slug cross section appropriate for the work shaped surface should be insulated handle, may not cross when laying and connecting, adjacent to a 3MM pitch, the distance between the sub-grid and guide grid should not be less than 10MM.
4, terrazzo before construction clean up the grass-roots ground and coated with insulating paint the exposed surface of the metal should be coated twice, and then laying reinforced guide grid, bar diameter 4MM-6MM, to network ground terminal should be welded solid.
5, the final construction terrazzo surface shall comply with the relevant regulations.
6, the ground prior to use in the terrazzo surface to fight anti-static floor wax.